Welcome to DaHao International Login Register
2026 China Hydropower Station Construction (Nyingchi) Expo
Industry: Industrial / Mechanical / Processing
Cycle: Once a year
Time: 2026/05/28 - 05/30 (Thur To Sat Total 3 Days)    Error Correction
Address: Nyingchi Yajiang Conference Center ChinaXizang Autonomous Regionnyingchi prefecture Linzhi County Baimagang Street, Bayi District, Nyingchi, Xizang
Sponsor:Beijing Jianke Exhibition Co., Ltd
Organizer:Xizang Yake Exhibition Co., Ltd
Co-organizer:China Rental Association
190Days To Go
  • Company:Beijing Jianke Exhibition Co., Ltd
  • Telephone:010-130 5190 7508
  • Contact:Lin Yue
  • Mobile:13051907508
  • E-mail:2020094233@qq.com
  • Address:Huairou District, Beijing

INTRODUCTION

2026 China Hydropower Station Construction (Nyingchi) Expo - www.globalomp.com

2026 China Hydropower Station Construction (Nyingchi) Expo - www.globalomp.com

When the torrent of the the Yarlung Zangbo River rushes forward through the Himalayan mountains, and when the pulse of the "roof of the world" and the lights of human civilization complement each other - we are standing at the turning point of the clean energy revolution, starting a great engineering practice related to the future of mankind. By November 2025, Xizang has built more than 10 large-scale hydropower stations, dozens of medium-sized hydropower stations and a large number of small hydropower stations.


The 2026 China Hydropower Station Construction (Linzhi) Expo has emerged, carrying three historical missions:

▶ To harness the power of a great nation's heavy machinery - this pinnacle work in the history of human hydraulic engineering, transforming the majestic kinetic energy of plateau rivers into clean electricity that illuminates the future, and forging the solid backbone of China's "dual carbon" strategy;

▶ For the dream of rebirth in the snow covered areas - take the super project as the engine, promote the modernization process of Xizang, and contribute to the ecological protection and sustainable development of the plateau with solutions of global significance;

▶ To build a dialogue platform that gathers the essence of global hydropower technology, so that Chinese wisdom and world experience can blend and resonate on the top of Qinghai Tibet.


The theme of this expo is "Extreme Power, Light of Rivers", focusing on four dimensions:

▶ Super Engineering Core: Showcasing the full industry chain innovation of world-class hydropower engineering - from ultra-high voltage unit manufacturing, intelligent construction systems to high-altitude extreme environment construction technology;

▶ Ecological conservation paradigm: presenting cutting-edge practices in river ecological map restoration and cross-border water civilization dialogue;

▶ Xizang's development engine: explore new industries, new infrastructure and new livelihood models driven by clean energy;

▶ Global Collaboration Network: Linking experts from 30 countries, Fortune 500 companies, and research institutions to jointly build a community of shared future for hydropower.


At this moment, we invite you to touch the heartbeat of the the Yarlung Zangbo River and witness the epic dance of steel and river. This is not only a feast of technology, but also a deep questioning of how humans can coexist with nature - under the sky of the Qinghai Tibet Plateau, we use water as ink and dams as pens to jointly write the "Declaration of the Third Pole Civilization of the Earth" belonging to this era.


Looking forward to embarking on this cross altitude intelligent expedition with you in 2026!
Exhibition advantages

Participation=strategic card, Xizang Hydropower Golden Decade

From technological breakthroughs to project implementation, from policy dividends to brand leaps - this expo will become the golden key for enterprises to unlock the "Roof of the World" energy treasure trove. Those who plan ahead will surely lead the new era of plateau hydropower!

Seize the national strategic trend and overcome the technical difficulties in high-altitude areas

An excellent stage for showcasing cutting-edge solutions deeply integrated into the clean energy artery, connecting scarce project resources and directly reaching the core circle of high-altitude hydropower construction

▶ Precise coverage of owners: bring together major development enterprises, Xizang Construction Engineering Group, Hydropower Infrastructure Bureau and other engineering parties to provide first-hand channels for high-level dialogue and project bidding information.

▶ Resource direct connection: Relevant supervisory units deeply participate and release the list of 14th/15th Five Year Plan projects, investment policies, and subsidy details.

▶ International cooperation springboard: attracting representatives from countries in South Asia and other regions, paving the way for enterprises to explore the South Asian hydropower market.


Concentrated release of policy dividends, low-cost entry into strategic markets, brand value multiplier, and creation of industry leadership image


▶ Authoritative endorsement: As the only top-level exhibition in China focusing on high-altitude hydropower, participating in the exhibition showcases the technical expertise and strategic foresight of enterprises.

▶ Differentiated marketing: appeared in theme exhibition areas such as "Xizang Hydropower Achievements Exhibition", and promoted the brand height with the help of national engineering IP.

▶ Global media focus: CCTV, People's Daily, and industry leading media (such as China Electric Power News) provide in-depth coverage, and the company's technological achievements have been exposed at the national level.


Concurrent Events

1 (Proposed) Xizang High Quality Hydropower Development Summit

Theme: "Innovation driven, green empowerment, win-win future - building a world-class plateau clean energy base"

Content: invite leaders, academicians and experts from relevant competent units, large energy groups, authoritative research institutions (General Water Planning Institute, Chengdu Institute, etc.) to interpret the national strategy, policy planning and development prospects of Xizang's hydropower; Exploring the challenges and breakthroughs in the construction and operation management of large-scale hydropower projects in high-altitude areas;

Format: keynote speech+high-level dialogue.


2 (Proposed) Special Technical Seminar (Parallel Sub Forum)


Forum 1: Key Technologies for Hydroelectric Engineering under High Altitude and Complex Geological Conditions

Topic: Treatment of ultra deep cover layer, high ground stress response, high ground temperature tunnel construction, high ground concrete technology, seismic design, construction machinery high-altitude adaptability transformation, etc.


Forum 2: Ecological Environment Protection and Restoration Technology for Plateau Hydropower Engineering

Topics: Ecological flow assurance of plateau rivers, protection and access of aquatic organisms, soil and water conservation and vegetation restoration, landscape coordination, post assessment of environmental impacts, carbon sequestration research, etc.


Forum 3: Intelligent Hydropower and Digital Operation and Maintenance

Topic: Intelligent design, construction and operation of hydropower stations in Xizang; BIM technology application; Remote centralized control and few person duty; Equipment status monitoring and intelligent diagnosis; The application of big data and artificial intelligence in predictive maintenance.


Forum 4: Xizang "Water, Scenery and Storage" Integrated Base Development and Delivery Technology

Topic: Multi energy complementary system planning and optimization scheduling; Large scale clean energy collection and high-altitude, long-distance ultra-high voltage transmission technology; The application prospect of energy storage (pumping and storage, electrochemistry, etc.) in Xizang.


3 (Proposed) Business docking and exhibition activities (promoting trade cooperation)


Super Engineering Procurement Demand Release Conference&Precise Matchmaking Meeting

Theme: "Conquering the Limits: High Performance Engineering Machinery and Equipment for Hydroelectric Power Projects"

Content

Invite the owner units and main contractors of the hydropower station project to release a procurement demand list (quantity, specifications, time nodes) for key equipment, materials, and technical services for the next 3-5 years.

Organize one-on-one, closed door negotiations between buyers with clear purchasing intentions and selected high-quality suppliers.

Set up dedicated docking areas according to equipment categories (earthmoving machinery, lifting machinery, mining machinery, transportation vehicles, concrete equipment, intelligent systems, key components, special building materials, etc.).

Format: centralized press conference+appointment based one-on-one negotiation+free communication in a dedicated area.

Highlight: Providing an efficient business platform to facilitate substantial cooperation intentions.


Innovation Technology and Product Launch Conference

Content

Provide a platform for exhibiting companies to release their latest products, technologies, or solutions in areas such as high-altitude hydropower engineering, green construction, and intelligent construction.

Format: Scheduled and fixed-point stage releases, accompanied by online live broadcasts.

Highlight: Concentrate on showcasing the latest achievements in the industry, attracting the attention of media and professional audiences.


Annual Innovation Product/Technology Selection and Display of "Golden Gear Award"

Content

Establish awards (such as Best Plateau Adaptability Equipment, Best Green Innovation Technology, Best Intelligent Construction Solution, and Most Promising New Product in the Market) and invite a panel of expert judges to evaluate. Set up a prominent display area for award-winning products/technologies at the exhibition.

Format: Enterprise application+expert review+award ceremony+special area display.

Highlight: Establishing industry benchmarks, guiding innovation direction, and enhancing the brand influence of award-winning enterprises.

4 (Proposed) "Building Dreams in Yajiang" Theme Photography/Short Video Competition

Content: Collect photographic works or short videos from professional photographers, project builders and the public to reflect the magnificent scenery of the the Yarlung Zangbo River, project construction scenes, builders' style, technological innovation and ecological harmony.

Format: Online solicitation+offline selection+excellent works displayed at the exhibition site and online platforms.

Highlight: Recording super projects from an artistic perspective and expanding their dissemination influence.

INVESTMENT PRIORITIES

Scope

Business scope

The focus of this exhibition is on the construction needs of the Linzhi Hydropower Station project in China, and we are recruiting outstanding enterprises, products, and technologies from the following fields worldwide to participate:

Core Engineering Equipment and Technology Exhibition Area

·High altitude special construction machinery:

High altitude tunnel excavation equipment (TBM/shield tunneling machine, cantilever tunneling machine)

O Low temperature resistant large tonnage lifting equipment (all terrain crane, tower crane)

High end excavators and loaders (with turbocharging and antifreeze system)

·Green Building Materials and Structures:

Additives for high-altitude frost resistant concrete

Prefabricated steel structure bridge/factory module

Ecological slope protection materials (vegetation concrete, three-dimensional drainage network)

·Geological tackling system:

Ultra deep hole exploration drilling rig (core drilling above 3000 meters)

Rock burst monitoring and support equipment (microseismic sensors, intelligent anchor rod trolley)

Construction technology for frozen soil (hot rod roadbed, frozen method construction equipment)

Clean Energy and Smart Grid Exhibition Area

Ecological Protection and Sustainable Development Zone


-Ecological restoration technology:

O Plateau vegetation restoration system (cold resistant grass species, drone seeding), river ecological corridor construction (fish migration channel, artificial spawning ground)


O - Low carbon operation plan:

Electrification transformation of construction machinery (pure electric excavators, hydrogen mining trucks) carbon footprint full lifecycle management platform


-Environmental monitoring system:

Glacier displacement radar monitoring station, water biological acoustic tracking equipment, construction area dust/noise real-time control system

Smart Construction and Digital Twin Exhibition Area


-Intelligent construction system:

BIM+GIS 3D geological modeling platform, tunnel unmanned driving slag removal fleet, high-altitude unmanned aerial vehicle group automatic inspection

-Digital twin applications:

A digital twin dam structure health AI diagnostic system for the entire lifecycle of hydropower stations


-Extreme environmental communication:

5G private network coverage plan for high-altitude areas, satellite IoT emergency communication terminal

Supply Chain and Supporting Services Exhibition Area

-Engineering materials:

Low temperature resistant special steel (-40 ℃ impact toughness guarantee) plateau specific lubricating oil/night oil UV resistant engineering tent

-Industrial services:

Cross border logistics solution for plateau equipment financing leasing engineering insurance customization service (China Nigeria Jilong Port Channel)

-Logistics support:

Modular pressurized oxygen chamber living area, prevention and treatment of high-altitude diseases, mobile hospital, cold chain food supply system


Costs & Precautions

Please contact the exhibition organizer before participating in the exhibition to confirm.

2026 China Hydropower Station Construction (Nyingchi) Expo - www.globalomp.com

2026 China Hydropower Station Construction (Nyingchi) Expo - www.globalomp.com

Contact

  • Company:Beijing Jianke Exhibition Co., Ltd
  • Telephone:010-130 5190 7508
  • Contact:Lin Yue
  • Mobile:13051907508
  • E-mail:2020094233@qq.com
  • Address:Huairou District, Beijing

Disclaimer

The information on this site comes from the network and related members, and the website has done its duty to review it. Due to the uncontrollability of the process of organizing the exhibition, some of the exhibition information in the station may change the subject matter, Extending or cancelling the event, please exhibitors and visitors must check with each other again before exhibiting! All the exhibitions in this site are not hosted/co-organized or organized, if there are any disputes during the exhibition, please hold the main responsibility of the exhibition organization! QQ Email: 523138820@qq.com WeChat: 523138820 Mobile: 15313206870

加载中...
加载中...