Welcome to DaHao International Login Register
2019 Shanghai International charging pile Exhibition
Industry:

Chemical / Energy / Environment

Time:

2019/05/06 - 05/08 (Mon To Wed Total 3 Days)    Error Correction

Address:

Pudong New Area · Shanghai Shanghai World Expo Exhibition and Convention Center 1099 Guozhan Road, Pudong New District, Shanghai

Sponsor:

Shanghai extended Exhibition Service Co., Ltd

Organizer:

Shanghai extended Exhibition Service Co., Ltd

Closed

INTRODUCTION

The opinions of the CPC Central Committee and the State Council on Comprehensively Strengthening the ecological environment protection and firmly fighting against pollution pointed out to increase the application of new energy and clean energy vehicles in urban public transport, taxi, urban distribution, postal express, airport, railway freight yard, key regional ports and other fields. Cooperate with relevant departments in the construction of charging facilities in expressway service area and airport. The guiding opinions on energy work in 2018 issued by the national energy administration points out that the standard of electric vehicle charging facilities should be unified, the layout of electric vehicle charging facilities should be optimized, and a moderately advanced, intelligent and efficient charging infrastructure system should be built. In 2018, we will actively promote the construction of charging piles, and plan to build 600000 charging piles, including 100000 public charging piles and 500000 private charging piles.

The 2019 Shanghai International charging pile Exhibition (CPE) will be held in Shanghai World Expo on May 6-8. The exhibition will present all-round new technologies and concepts in the field of charging piles from an international perspective, bringing together domestic and foreign charging equipment enterprises to display charging piles, charging stations, chargers, charging cabinets, distribution equipment, distribution cabinets, transformers, wireless charging piles For the latest products and technologies of charging technology and electric vehicle charging, CPE organizing committee is determined to fully promote the development of new energy vehicles and charging piles, strive to connect the Yangtze River Delta, face domestic and overseas, radiate all over China, serve the world, and strive to build the most influential procurement and trade platform in China as a whole.

Scope

● intelligent charging solutions: charging pile, charger, power module, power exchange equipment, etc;

● supporting facilities solutions: inverter, transformer, charging cabinet, distribution cabinet, filtering equipment, high and low voltage protection equipment, converter, relay, etc;

● solutions for construction and operation of charging facilities;

● on board power supply, on-board charger, motor, electric control, etc;

● capacitor, energy storage battery and battery management system;

● connectors, cables, harnesses, etc;

● photovoltaic system, energy storage system, control system, etc;

Costs & Precautions


Contact

  • Telephone:021-51987155
  • Truename:Jing Hua Wu
  • Mobile:13917313759
  • Fax:021-54890578
  • E-mail:jinghua.wu@kuozhan.com.cn
  • QQ:2881979553
  • Address:Room 801, block B, Vanke center building, 970 Nanning Road, Xuhui District, Shanghai

Disclaimer

The information on this site comes from the network and related members, and the website has done its duty to review it. Due to the uncontrollability of the process of organizing the exhibition, some of the exhibition information in the station may change the subject matter, Extending or cancelling the event, please exhibitors and visitors must check with each other again before exhibiting! All the exhibitions in this site are not hosted/co-organized or organized, if there are any disputes during the exhibition, please hold the main responsibility of the exhibition organization! QQ Email: 523138820@qq.com WeChat: 523138820 Mobile: 15313206870

HOT

Expo News