Welcome to DaHao International Login Register
2026 China (Yangjiang) International Offshore Wind Power Engineering and Equipment Exhibition
Industry: Other Industry
Time: 2026/12/22 - 12/24 (Tues To Thur Total 3 Days)    Error Correction
Address: Shandong Yangjiang International Convention and Exhibition Center ChinaShandong ProvinceQingdaoChengyang District 675 Wenyang Road, Chengyang District, Qingdao City, Shandong Province
Sponsor:2026 China (Yangjiang) International Offshore Wind Power Engineering and Equipment Exhibition
Organizer:2026 China (Yangjiang) International Offshore Wind Power Engineering and Equipment Exhibition
195Days To Go
  • Telephone:13162771109
  • Contact:Mr. Zhang
  • Mobile:13162771109
  • Address:675 Wenyang Road, Chengyang District, Qingdao City, Shandong Province

INTRODUCTION

2026 China (Yangjiang) International Offshore Wind Power Engineering and Equipment Exhibition - www.globalomp.com

2026 China (Yangjiang) International Offshore Wind Power Engineering and Equipment Exhibition - www.globalomp.com

2026 China (Yangjiang) International Offshore Wind Power Engineering and Equipment Exhibition

China Yangjiang Ocean Wind Energy Conference (OWF2026)

Date: December 22-24, 2026 Location: Yangjiang International Convention and Exhibition Center

Exhibition Introduction:

The abundant wind energy resources in Yangjiang City have attracted leading enterprises in industries such as CGN, Huadian, Yuedian, and Three Gorges to compete for the wind. Since the first wind power pile was installed in the Yangjiang sea area in September 2017, in eight years, Yangjiang has formed a planned total installed capacity of 20 million kilowatts of offshore wind power, with a grid connected installed capacity of over 6 million kilowatts, accounting for half of Guangdong Province and ranking second in the country. With the goal of building Guangdong (Yangjiang) International Wind Power City and guided by the "dual core drive" of core technology and core products, we will introduce domestic wind power equipment manufacturing industry chain core enterprises and upstream and downstream supporting enterprises, accurately attract key component manufacturing projects such as wind power bearings, wind power gearboxes, and wind power forging flanges, achieve the development of the offshore wind power industry chain, and create a leading production base for global offshore wind power technology.

As of now, Yangjiang has formed a planned total installed capacity of 20 million kilowatts of offshore wind power, of which 24 projects totaling 13 million kilowatts have been fully approved. The grid connected installed capacity exceeds 6 million kilowatts, accounting for 50% of the province and ranking second in the country. By 2026, the total installed capacity of Yangjiang offshore wind power grid connected is expected to exceed 13 million kilowatts, becoming the first offshore wind power base in China with a scale exceeding 10 million kilowatts. Yangjiang has risen to become the largest and most complete offshore wind power development base and wind power equipment manufacturing base in China, and has become a promoter and leader of global offshore wind power. The 2026 China (Yangjiang) International Offshore Wind Power Engineering and Equipment Exhibition and the China Yangjiang Ocean Wind Energy Conference (OWF2026) will be held from December 22-24, 2026 at the Yangjiang International Convention and Exhibition Center. We will focus on the latest developments and cutting-edge trends in the offshore wind power industry chain, including offshore wind power equipment and core components, raw materials and parts, offshore equipment and technology, electrical and control systems, and conduct in-depth discussions and exchanges. The exhibition is not only a concentrated display of the development achievements of Yangjiang's offshore wind power industry, but also an important opportunity to promote the high-quality development of global offshore wind power. It marks Yangjiang's move towards a new highland of the global offshore wind power industry with a more open and confident attitude. We will build a high-quality platform that integrates exhibition, communication, and cooperation for the global offshore wind power industry.

Scope of exhibits:

Key materials: epoxy resin, aluminum alloy, carbon fiber, inverter, sensor, bearing, coating, reinforcing fiber, structural components, frequency converter, wheel hub, etc;

Core components: wind turbine, blades, flanges, bearings, gearbox, tower, main control system, submarine cable, wind power castings, generator, etc;

Electrical and control core systems (inverters, submarine cables, electrical control systems), etc;

Floating offshore wind power related (floating bodies, mooring and anchoring systems), etc;

◆ Other: construction and installation, survey and design, lifting equipment, pile driving equipment, hydraulic equipment, hoisting equipment, high-altitude operation equipment, underwater robots, platform explosion-proof electrical, platform air conditioning and ventilation, pipelines and pump valves, alarm monitoring, rescue and firefighting, instruments and meters, diving support ships, platform steel structure construction, anti-corrosion and coating, welding equipment, salvage and rescue ships, non-destructive testing, offshore wind power equipment installation ships, underwater engineering, water treatment technology and equipment, offshore construction, wire and cable, shipping services, platform mooring systems, platform lifting equipment, marine environment and safety, etc;

Power transmission and grid connection: covering submarine high-voltage cables, offshore substation platforms, flexible DC transmission technology, and grid connection solutions, etc;

◆ Marine Engineering and Construction: Offshore wind power infrastructure (such as pipeline racks, single piles), offshore wind power installation ships, operation and maintenance ships, lifting platforms, large transportation equipment, and port support equipment, etc;

Operation and maintenance solutions: service platform, detection technology, maintenance tools, and maintenance strategies, etc;

Software and digital innovation: simulation tools, analysis platforms, remote diagnosis, and intelligent energy management systems, etc;

Intending to invite domestic and foreign wind power leading enterprises such as Goldwind Technology, Yuanjing Energy, Mingyang Intelligent, Yunda Co., Ltd., CRRC, CSSC Technology, Sany Heavy Energy, Electric Wind Power, Dongfang Electric, Huarui Wind Power, Xinglan Wind Power, Huadian Heavy Industry, Longyuan Zhenhua, Haoshi Weima, Zhongtian Technology, Cooperative Operation and Maintenance, Juli Rigging, Hengtong, Elite, Fanda Technology, and Afagma to join the event with industry-leading products and technologies.

Industry elites gather to seek industrial development together

At that time, industry leaders, experts, scholars, and corporate executives from around the world will gather together to deeply explore the development trends, technical difficulties, and solutions of offshore wind power through summit forums, technical seminars, new product launches, and other forms. Exhibitors will have the opportunity to communicate face-to-face with potential customers and partners, gain insights into market opportunities, and expand their business networks.

At the same time as this exhibition, the Ocean Wind Energy Conference will continue to be held, focusing on topics such as policy support, market dynamics, technological innovation, and industry chain development, to explore how to build an efficient, stable, and sustainable offshore wind power industry chain, provide strategic and technical support for industry development, provide valuable market information for participants, and jointly promote the progress of offshore wind power technology and the prosperous development of the industry.

Exhibition matters

1. Exhibitors shall fill in the "Exhibition Contract Form" in detail and affix their official seal, and mail or fax it to the organizing committee;

2. The organizing committee has received the confirmation application form. Exhibitors must transfer 50% or the full amount of the exhibition fee to the organizing committee's account within 5 working days, and fax the remittance voucher to the organizing committee for verification. Otherwise, the reserved booth will not be retained.

3. The booth arrangement is based on the principle of "first come, first paid, first arranged", and the organizing committee has the right to adjust a small number of booths;

4. The transportation of exhibits, exhibition reception, accommodation and other matters will be separately sent by the organizing committee in the form of an "Exhibitor Handbook" one month before the event.

Exhibition Consultation

Hotline: 021-52237201

Contact: Mr. Zhang 13162771109

Scope

2026 China (Yangjiang) International Offshore Wind Power Engineering and Equipment Exhibition - www.globalomp.com

2026 China (Yangjiang) International Offshore Wind Power Engineering and Equipment Exhibition - www.globalomp.com


Costs & Precautions

Please contact the exhibition organizer before participating in the exhibition to confirm.

Contact

  • Telephone:13162771109
  • Contact:Mr. Zhang
  • Mobile:13162771109
  • Address:675 Wenyang Road, Chengyang District, Qingdao City, Shandong Province

Disclaimer

The information on this site comes from the network and related members, and the website has done its duty to review it. Due to the uncontrollability of the process of organizing the exhibition, some of the exhibition information in the station may change the subject matter, Extending or cancelling the event, please exhibitors and visitors must check with each other again before exhibiting! All the exhibitions in this site are not hosted/co-organized or organized, if there are any disputes during the exhibition, please hold the main responsibility of the exhibition organization! QQ Email: 523138820@qq.com WeChat: 523138820 Mobile: 15313206870

加载中...
加载中...