Welcome to DaHao International Login Register
2019 China International distributed energy and gas turbine equipment and Technology Exhibition
Industry:

Industrial / Mechanical / Processing

Time:

2019/10/17 - 10/19 (Thur To Sat Total 3 Days)    Error Correction

Address:

Chaoyang District · Beijing China International Exhibition Center - old museum 6 Beisanhuan East Road, Chaoyang District, Beijing

Sponsor:

China Machinery Industry Federation

Organizer:

Beijing Qifa Exhibition Service Co., Ltd., China Electrotechnical Society, China Power Engineering Society

Closed

INTRODUCTION

In the next few decades, natural gas will become a pillar of low-carbon energy and an important transitional alternative energy. Therefore, increasing the proportion of natural gas consumption is an important measure to optimize the energy structure during the 13th five year plan. It is estimated that by 2020, the proportion of natural gas in primary energy consumption will increase to more than 10%. In that year, the national natural gas consumption may reach 400-420 billion cubic meters, of which 1 / 4 will be used for power generation, and the installed capacity of gas generating units will reach 100 million kilowatts, that is to say, the annual average new gas generating units will be nearly 8 million kilowatts during the 13th Five Year Plan period.
For the development of gas turbine generator units in the next five years, the national energy development strategy has formulated a new action plan to encourage the development of distributed natural gas energy, orderly develop natural gas peak shaving power stations in response to the demand of power grid peak shaving in key prevention and control areas of air pollution in the East, and moderately develop gas steam combined cycle cogeneration combined with the demand of heat load. In this way, new requirements are put forward for the demand of gas turbine for power generation in China. First, the capacity range of gas turbine is expanded. 100kW ~ 5MW gas turbine is used for distributed energy, 20 ~ 60MW gas turbine is used for regional distributed power station, and 100 ~ 300MW gas turbine is used for peak load regulation or cogeneration power station. In particular, the demand of distributed energy for gas turbine is solved. Second, the gas turbine is improved The unit adapts to the requirements of the peak load regulation performance of the power grid. On the premise of satisfying the peak load regulation of the power grid, the unit operation life loss caused by peak load regulation operation shall be reduced as much as possible. Thirdly, the new gas turbine with higher efficiency, lower emission and reasonable price shall be further developed or applied to relieve the pressure caused by the high gas price in China on the development of gas turbine. "2018 China international natural gas distributed energy and gas turbine equipment and Technology Exhibition" is held in response to China's new demand for gas turbines for power generation during the 13th Five Year Plan period and to solve the problems in the development of gas power generation in China. It shows the latest products and strength for Chinese and foreign gas turbine manufacturers and builds for units engaged in gas turbine manufacturing, operation, design and construction, scientific research and universities Build a platform for technical exchange. In the first year of the 13th five year plan, we sincerely do something for the gas turbine power generation industry in China.
"2019 China International distributed energy and gas turbine equipment and Technology Exhibition" will be held in China International Exhibition Center, Beijing on October 17-19, 2019, sponsored by China Machinery Industry Federation, jointly sponsored by China Electrical Technology Society and Beijing Enterprise Development Exhibition Service Co., Ltd. At that time, there will be world-famous enterprises from more than 10 countries and regions, such as America, Europe and Asia, as well as many domestic manufacturers, gas turbine power plants, design and construction, scientific research institutes and other units to participate in exhibitions and technical exchanges, focus on and comprehensively display the latest technology and equipment of gas turbines, and in-depth exchanges and discussions on hot issues of gas turbine development. We sincerely welcome the large number of enterprises and professionals in the gas turbine industry to actively participate, and we look forward to your presence!

Scope

Complete gas turbine
◆ compressor: compressor cylinder, rotor, moving blade, stationary blade, etc,
◆ combustion system: combustion chamber, flame tube, fuel nozzle, igniter, etc,
◆ turbine: turbine cylinder (cylinder), stationary blade, rotor, moving blade, air seal, exhaust diffuser, etc,
◆ automatic control system: gas turbine TCS controller
◆ auxiliary equipment: air system, startup system, air inlet filtration system, lubricating oil system, cooling water system, fuel system (gas supply and filtration equipment and valve pipeline),
◆ control equipment and valve pipeline
◆ gas turbine intake system equipment: exhaust expansion joint, gas turbine cover and ventilation equipment, motor control center, variable frequency starting system, fire fighting equipment, special tools, etc,
◆ gas steam combined cycle: gas turbine, steam turbine, waste heat boiler, generator
◆ CCHP technology and equipment, waste heat recovery, distributed generation and energy storage, distributed energy intelligent control and group control optimization technology display, distributed photovoltaic generation display, distributed wind power generation display

Costs & Precautions

Standard booth fee: (3m × 3M)
Domestic enterprises 15800 yuan / booth, exhibition period; joint venture 19800 yuan / booth, exhibition period
3800 euros / booth and exhibition period for overseas enterprises
Luxury special bid (3m × 3M, including: interior color pages, light boxes, logos, negotiation tables and chairs)
Domestic enterprises: 21800 yuan / booth, exhibition period; joint venture: 28800 yuan / booth, exhibition period
4600 euro / booth and exhibition period for overseas enterprises
Basic price of open space (area no less than 36m2)
Domestic enterprises: 1600 yuan / m2; joint ventures: 2000 yuan / m2
400 euro / m2 extension for overseas enterprises

Contact

  • Telephone:010— 6550 1616
  • Truename:Li Shi You
  • Fax:010— 5141 5666
  • E-mail:lsy_zl@vip.163.com
  • Address:Room 1301, building C, Ocean International Center, No. 60, East 4th Ring Middle Road, Chaoyang District, Beijing
  • Zipcode:100025

Disclaimer

The information on this site comes from the network and related members, and the website has done its duty to review it. Due to the uncontrollability of the process of organizing the exhibition, some of the exhibition information in the station may change the subject matter, Extending or cancelling the event, please exhibitors and visitors must check with each other again before exhibiting! All the exhibitions in this site are not hosted/co-organized or organized, if there are any disputes during the exhibition, please hold the main responsibility of the exhibition organization! QQ Email: 523138820@qq.com WeChat: 523138820 Mobile: 15313206870

HOT

Expo News